引用本文:赵书强,索璕,许朝阳,马燕峰,周鹏,王小威.考虑断面约束的多能源电力系统时序性生产模拟[J].电力自动化设备,2021,41(7):
ZHAO Shuqiang,SUO Xun,XU Zhaoyang,MA Yanfeng,ZHOU Peng,WANG Xiaowei.Time series production simulation of multi-energy power system considering section constraints[J].Electric Power Automation Equipment,2021,41(7):
【打印本页】   【HTML】   【下载PDF全文】   查看/发表评论  【EndNote】   【RefMan】   【BibTex】
←前一篇|后一篇→ 过刊浏览    高级检索
本文已被:浏览 3761次   下载 1563  
考虑断面约束的多能源电力系统时序性生产模拟
赵书强1, 索璕1, 许朝阳1, 马燕峰1, 周鹏2, 王小威2
1.华北电力大学 新能源电力系统国家重点实验室,河北 保定 071000;2.国网青海省电力公司,青海 西宁 810000
摘要:
传统电力系统随机生产模拟方法难以描述新能源发电机组时序特性以及计算与时序特性有关的电力系统运行指标,导致生产模拟的准确性欠佳。提出含风电、光伏、水电、火电、光热及储能的多能源时序性随机生产模拟方法。将系统运行调度策略与随机生产模拟中各类型机组的加载顺序相结合,计及电力系统网架断面约束,充分保证新能源的优先消纳。为保留电力系统时序特性,基于等效电量函数法以每小时作为模拟步长统计模拟期间内的系统运行指标。我国某省实际电力系统随机生产模拟结果验证了所提方法的有效性。
关键词:  断面约束  多能源电力系统  时序性生产模拟  等效电量函数法
DOI:10.16081/j.epae.202104011
分类号:TM743
基金项目:国家重点研发项目(2017YFB0902200);国家电网公司科技项目(5228001700CW)
Time series production simulation of multi-energy power system considering section constraints
ZHAO Shuqiang1, SUO Xun1, XU Zhaoyang1, MA Yanfeng1, ZHOU Peng2, WANG Xiaowei2
1.State Key Laboratory of Alternate Electrical Power System with Renewable Energy Sources, North China Electric Power University, Baoding 071000, China;2.State Grid Qinghai Electric Power Company, Xining 810000, China
Abstract:
The traditional stochastic production simulation methods of power system are difficult to describe the time series characteristics of renewable energy generator units and calculate the operation indexes of power system related to time series characteristics, which results in poor accuracy of production simulation. A multi-energy time series stochastic production simulation method including wind power, photovoltaic, hydropower, thermal power, photothermal and energy storage is proposed. The system operation scheduling strategy and the loading sequence of each type unit in stochastic production simulation are combined, taking the section constraints of power system into account, the priority consumption of renewable energy is fully guaranteed. In order to preserve the time series characteristics of power system, the system operation index during the simulation period is counted based on the equivalent energy function method with per hour as the simulation step. The stochastic production simulation results of an actual power system in a province of China verify the effectiveness of the proposed method.
Key words:  section constraint  multi-energy power system  time series production simulation  equivalent energy function method