引用本文:李军徽,朱星旭,严干贵,穆 钢,王芝茗,罗卫华.模块化VRB-EC混合储能系统配置与控制的优化[J].电力自动化设备,2014,34(5):
LI Junhui,ZHU Xingxu,YAN Gangui,MU Gang,WANG Zhiming,LUO Weihua.Optimal configuration and control of modular VRB-EC hybrid energy storage system[J].Electric Power Automation Equipment,2014,34(5):
【打印本页】   【HTML】   【下载PDF全文】   查看/发表评论  【EndNote】   【RefMan】   【BibTex】
←前一篇|后一篇→ 过刊浏览    高级检索
本文已被:浏览 4623次   下载 1927  
模块化VRB-EC混合储能系统配置与控制的优化
李军徽1, 朱星旭1, 严干贵1, 穆 钢1, 王芝茗2, 罗卫华2
1.东北电力大学 电气工程学院,吉林 吉林 132012;2.国网辽宁省电力有限公司,辽宁 沈阳 110000
摘要:
提出了一种适用于全钒液流电池-电化学电容器(VRB-EC)混合储能系统(HESS)的控制策略,分析了EC的最优配置数量及HESS的最小成本。根据风电预测数据设计HESS总充放电功率,通过设定EC的动作区间以降低对VRB的损耗,通过排序法实现对VRB各单元充电任务的合理分配。基于某风电场30 d实测及预测数据,仿真分析了EC配置数量对HESS成本的影响,得到了HESS的最优配置及最小成本,为工程应用中VRB-EC混合储能系统运行方式的制定和配置的选择提供了参考依据。
关键词:  风电  预测  储能  全钒液流电池  电化学电容器  分组控制  优化
DOI:
分类号:
基金项目:国家高技术研究发展计划(863计划)项目(2011AA-05A112);国家自然科学基金资助项目(60934005,51207018);吉林省教育厅“十二五”科技项目(吉教科合字[2012]89号) ;东北电力大学博士点基金资助项目(BSJXM-201205)
Optimal configuration and control of modular VRB-EC hybrid energy storage system
LI Junhui1, ZHU Xingxu1, YAN Gangui1, MU Gang1, WANG Zhiming2, LUO Weihua2
1.School of Electrical Engineering,Northeast Dianli University,Jilin 132012,China;2.Liaoning Province Electric Power Company of State Grid,Shenyang 110000,China
Abstract:
A control strategy for the HESS (Hybrid Energy Storage System) composed of all-VRB(Vanadium Redox flow Battery) and EC(Electrochemical Capacitor) is proposed,and the optimal quantity of configured ECs and the minimum cost of HESS are analyzed. The total charge/discharge power of HESS is designed based on the wind power forecast data,the EC action interval is set to reduce the loss of VRB,and the sorting method is applied to reasonably distribute the charging task for each VRB cell. According to the measured and forecasted data of a wind farm for 30 days,the influence of configured EC quantity on the HESS cost is simulated and analyzed,and the optimal quantity of configured ECs and the minimum cost of HESS are obtained,which can be referred during the engineering of VRB-EC HESS Project for its operation mode design and EC configuration.
Key words:  wind power  forecasting  energy storage  vanadium redox flow battery  electrochemical capacitor  group control  optimization

用微信扫一扫

用微信扫一扫