引用本文:黄桦,潘学萍,李佳伟,袁小明,鞠平.直驱永磁风电机组LVRT模型参数的整定方法与实测验证[J].电力自动化设备,2019,39(4):
HUANG Hua,PAN Xueping,LI Jiawei,YUAN Xiaoming,JU Ping.Parameter setting method and measurement verification of LVRT model for direct drive permanent magnet wind turbine generator[J].Electric Power Automation Equipment,2019,39(4):
【打印本页】   【HTML】   【下载PDF全文】   查看/发表评论  【EndNote】   【RefMan】   【BibTex】
←前一篇|后一篇→ 过刊浏览    高级检索
本文已被:浏览 4058次   下载 1880  
直驱永磁风电机组LVRT模型参数的整定方法与实测验证
黄桦1,2, 潘学萍2, 李佳伟2, 袁小明1, 鞠平2
1.华中科技大学 电气与电子工程学院,湖北 武汉 430074;2.河海大学 能源与电气学院,江苏 南京 211100
摘要:
针对直驱永磁风电机组,提出低电压穿越(LVRT)模型参数的整定方法。基于直驱永磁风电机组的通用模型结构,计算各参数的轨迹灵敏度,获得LVRT模型的关键参数。指出由于参数的非线性特性,现有的基于轨迹灵敏度的参数辨识方法难以适用。为此,提出将参数调整与参数优化相结合的参数整定方法。以某直驱永磁风电机组为例,基于实测数据进行了参数整定及模型验证,并进行了其他扰动场景下的适应性分析,结果验证了所提方法的可行性和有效性。
关键词:  直驱永磁风电机组  低电压穿越  参数整定  实测验证  轨迹灵敏度  适应性分析  模型
DOI:10.16081/j.issn.1006-6047.2019.04.023
分类号:TM614
基金项目:新能源发电与智能电网“111”引智计划(B14022)
Parameter setting method and measurement verification of LVRT model for direct drive permanent magnet wind turbine generator
HUANG Hua1,2, PAN Xueping2, LI Jiawei2, YUAN Xiaoming1, JU Ping2
1.School of Electrical and Electronic Engineering, Huazhong University of Science & Technology, Wuhan 430074, China;2.College of Energy and Electrical Engineering, Hohai University, Nanjing 211100, China
Abstract:
A parameter setting method of LVRT(Low Voltage Ride-Through) model is proposed for direct drive permanent magnet wind turbine generators. The trajectory sensitivity of each parameter is calculated based on the universal model structure of direct drive permanent magnet wind turbine generator and the key parameters of LVRT model are obtained. It is pointed out that the existing parameter identification methods based on trajectory sensitivity are difficult to be applied because of the nonlinear characteristics of parameters. Therefore, a parameter setting method combined with parameter adjustment and parameter optimization is proposed. The parameter setting and model verification are taken out based on the measured data of a direct drive permanent magnet wind turbine generator and the adaptability under other disturbance scenarios is analyzed. The results verify the feasibility and effectiveness of the proposed method.
Key words:  direct drive permanent magnet wind turbine generator  LVRT  parameter setting  measurement verification  trajectory sensitivity  adaptation analysis  models

用微信扫一扫

用微信扫一扫