引用本文:沈美燕,胡哲晟,刘曌煜,戴攀,黄晶晶,杨莉.考虑效益耦合和时序关联特性的配电网规划项目多阶段双Q优选[J].电力自动化设备,2020,40(6):
SHEN Meiyan,HU Zhesheng,LIU Zhaoyu,DAI Pan,HUANG Jingjing,YANG Li.Optimal multi-stage dual-Q selection for distribution network planning projects considering benefit coupling and timing correlation characteristics[J].Electric Power Automation Equipment,2020,40(6):
【打印本页】   【HTML】   【下载PDF全文】   查看/发表评论  【EndNote】   【RefMan】   【BibTex】
←前一篇|后一篇→ 过刊浏览    高级检索
本文已被:浏览 4026次   下载 1744  
考虑效益耦合和时序关联特性的配电网规划项目多阶段双Q优选
沈美燕1, 胡哲晟2, 刘曌煜2, 戴攀2, 黄晶晶2, 杨莉1
1.浙江大学 电气工程学院,浙江 杭州 310027;2.国网浙江省电力有限公司经济技术研究院,浙江 杭州 310020
摘要:
电网企业在有限的预算下进行配电网规划项目优选是配电网精准投资的关键,但目前规划项目优选很少定量考虑项目间相互关系对配电网绩效提升的影响。定义配电网规划项目效益耦合和时序关联的相互关系,并在配电网双Q规划方法的基础上,结合不同地区的供电可靠性差异化要求,以停电损失减少量衡量配电网项目提升的可靠性效益,建立综合考虑效益耦合和时序关联的多阶段多区域配电网规划项目优选模型。含多个供电区域的配电网规划项目库的算例结果验证了所建模型的合理性和有效性。
关键词:  配电网规划  双Q理论  效益耦合  时序关联  供电区域差异性  项目优选
DOI:10.16081/j.epae.202005022
分类号:TM73
基金项目:国家重点研发计划项目(2016YFB0900100);国家自然科学基金资助项目(51777185);浙江省自然科学基金资助项目(LY17E070003);国家电网公司科技项目(5211JY17000L)
Optimal multi-stage dual-Q selection for distribution network planning projects considering benefit coupling and timing correlation characteristics
SHEN Meiyan1, HU Zhesheng2, LIU Zhaoyu2, DAI Pan2, HUANG Jingjing2, YANG Li1
1.College of Electrical Engineering, Zhejiang University, Hangzhou 310027, China;2.State Grid Zhejiang Economic Research Institute, Hangzhou 310020, China
Abstract:
Optimal selection of distribution network planning projects for power grid enterprises under limited budget is the key for accurate investment of distribution network, but the impact of the correlation between projects on the performance improvement of distribution network is seldom quantitatively considered in current optimal selection of planning projects. The relationship of benefit coupling and timing correlation between distribution network planning projects is defined. On the basis of dual-Q planning method of distribution network and combined with different requirements of power supply reliability in different regions, the reduction of power outage loss is adopted to measure the upgrading reliability benefit of distribution network project, and an optimal multi-stage multi-area distribution network planning project selection model is built, which considers the benefit coupling and timing correlation. The case results of planning project database of distribution network with multiple power supply areas verify the reasonability and effectiveness of the proposed model.
Key words:  distribution network planning  dual-Q theory  benefit coupling  timing correlation  power supply regional difference  optimal project selection

用微信扫一扫

用微信扫一扫