摘要: |
根据CSC2000自动化系统在变电站的运行经验,介绍了高速LonWorks网络和分层分布式结构的主要特点,并概括了间隔层保护,远动主站,当地监控主站,工程师主站及测控设备的软硬件配置及功能。总结了该系统在变电站的维护,管理和运行,介绍了该系统与其他公司(厂家)各种设备的数据通信接口。 |
关键词: 变电站 自动化系统 CSC2000 现场总线 |
DOI: |
分类号:TM63 TM76 |
基金项目: |
|
Application of CSC2000 Integrated Automation System in Substation |
LUO Jia quan 1 WANG Ming yong 1 HE Yi 2
|
Abstract: |
Based on in situ operational experience, the main features of CSC2000 Integrated Automation System of Beijing Hathaway Sifang Protection and Control Co., Ltd. is introduced, which adopts high speed LonWorks network and distributed hierarchy system structure. The SW and HW configurations and functions of cell level protection,remote control station, local monitoring station,engineer station and measuring and control equipment are summarized. The data communication interfaces of the system to other companies' devices are also described. |
Key words: protection,integrated automation,substation,equipment configuration |