华中电网"7.30”事故分析
鄢发齐,唐瑛
作者单位
摘要:
介绍1997年7月30日华中电网葛二江电厂220kV I母失压事故及处理过程,并对事故中所暴露出的问题进行了分析,突出强调解决鄂西水电外送配套电网建设遗留问题的重要性和紧迫性。
关键词:  电网 事故分析 运行方式 电力线路
DOI:
分类号:TM732
基金项目:
Analysis of a Contingency of Center China Power Network
YAN Fa-qi 1  HUANG Zi-ping 1  TANG Yin 2
Abstract:
A severe contingency of Center China power network and its treatment process are described, which occurred on July 30, 1997 in Geerjiang Hydropower Plant and caused the voltage of No.1 bus bar falling to zero. The problems exposed are analyzed, the importance and urgency of solving them are emphasized, which were left by the power network construction for power transmission from hydropower stations in West Hubei to outside.
Key words:  power network,contingency analysis,power transmission,