引用本文: | 桂林,王维俭,孙宇光,王祥珩.100~300MW水轮发电机主保护配置方案的优化[J].电力自动化设备,2005,(9):15-19 |
| .Optimization of main protection configuration scheme for hydro-generators from 100 to 300 MW[J].Electric Power Automation Equipment,2005,(9):15-19 |
|
|
摘要: |
以8台水轮发电机的主保护设计为例,对比了传统设计方案和定量化设计方案的性能.说明不能以每相分支数相或容量相等/相近为理由而相互套用或照搬主保护配置方案。由于100~300MW水轮发电机的绕组设计非常灵活,使得实际可能发生的故障特点各不相同.应作内部学冀兰算决定100~300MW水轮发电机的主保护配置方案。 |
关键词: 水轮发电机 内部短路计算 主保护配置方案 定量化设计 |
DOI: |
分类号:TM772 |
基金项目: |
|
Optimization of main protection configuration scheme for hydro-generators from 100 to 300 MW |
GUI Lin WANG Wei-jian SUN Yu-guang WANG Xiang-heng
|
Abstract: |
With the main protection designs of eight hydro-generators as examples.the main protection configuration scheme is compared with the quantitative design scheme,which explains that main protection configuration scheme can not be applied indiscriminately to different type hydro-generators with similar branch number or capacity. The different stator winding designs of hydro-generators from 100 to 300 MW lead to different fault features. It is better to design the main protection configuration scheme for medium hydro-generators based on internal fault simulation. |
Key words: hydro-generator internal fault simulation main protection configuration scheme quantitative design |