引用本文:王大江,顾雪平,贾京华.基于SE-DEA模型的扩展黑启动方案恢复相对效率研究[J].电力自动化设备,2015,35(2):
WANG Dajiang,GU Xueping,JIA Jinghua.Relative efficiency of extended black-start restoration plans based on super efficiency data envelopment analysis model[J].Electric Power Automation Equipment,2015,35(2):
【打印本页】   【HTML】   【下载PDF全文】   查看/发表评论  【EndNote】   【RefMan】   【BibTex】
←前一篇|后一篇→ 过刊浏览    高级检索
本文已被:浏览 4762次   下载 2135  
基于SE-DEA模型的扩展黑启动方案恢复相对效率研究
王大江1, 顾雪平1, 贾京华2
1.华北电力大学 新能源电力系统国家重点实验室,河北 保定 071003;2.河北电力调度通信中心,河北 石家庄 050021
摘要:
针对扩展黑启动方案的恢复相对效率研究, 提出了一种基于超效率数据包络分析模型的评估方法。首先,介绍了数据包络分析模型基本理论;然后,根据扩展黑启动同时启动多台机组形成规模更大系统的具体实际,构建了涵盖恢复时间、机组恢复效果、网络结构性能等反映恢复过程中多要素的评估指标,在此基础上以超效率数据包络分析模型评估其相对效率。以实际电网的扩展黑启动方案作为分析算例,计算结果验证了所提出的基于超效率数据包络分析模型评估方法能够对扩展黑启动方案恢复相对效率做出客观有效的评价。
关键词:  停电  黑启动  扩展黑启动  效率  评估  数据包络分析  评估指标
DOI:
分类号:
基金项目:国家自然科学基金资助项目(51277076);高等学校博士学科点专项科研基金资助项目(20110036110007);中央高校基本科研业务费专项资金资助项目(13XS23)
Relative efficiency of extended black-start restoration plans based on super efficiency data envelopment analysis model
WANG Dajiang1, GU Xueping1, JIA Jinghua2
1.State Key Laboratory of Alternate Electrical Power System with Renewable Energy Sources, North China Electric Power University,Baoding 071003,China;2.Hebei Electric Power Dispatching and Communication Center,Shijiazhuang 050021,China
Abstract:
An assessment method based on the SE-DEA(Super Efficiency Data Envelopment Analysis) model is proposed to investigate the relative efficiency of extended black-start restoration plan. The basic theory of DEA model is introduced and multiple assessment indexes are constructed according to the simultaneous restart of multiple units in extended black-start to reflect the multiple factors of restoration process,such as restoration time,unit restoration,network structure and so on,based on which,the SE-DEA model is adopted to evaluate its relative efficiency. As an example,an actual extended black-start restoration plan is evaluated by the proposed method and results demonstrate that it evaluates the relative efficiency of extended black-start restoration plan objectively and effectively.
Key words:  outages  black-start  extended black-start  efficiency  assessment  data envelopment analysis  assessment index

用微信扫一扫

用微信扫一扫