引用本文:王蓓蓓,李义荣,李 扬,窦 迅.考虑响应不确定性的可中断负荷参与系统备用配置的协调优化[J].电力自动化设备,2015,35(11):
WANG Beibei,LI Yirong,LI Yang,DOU Xun.Optimal coordination between system reserve and interruptible loads with response uncertainty[J].Electric Power Automation Equipment,2015,35(11):
【打印本页】   【HTML】   【下载PDF全文】   查看/发表评论  【EndNote】   【RefMan】   【BibTex】
←前一篇|后一篇→ 过刊浏览    高级检索
本文已被:浏览 4081次   下载 1625  
考虑响应不确定性的可中断负荷参与系统备用配置的协调优化
王蓓蓓1, 李义荣1, 李 扬1, 窦 迅2
1.东南大学 江苏省智能电网技术与装备重点实验室,江苏 南京 210096;2.南京工业大学 自动化与电气工程学院,江苏 南京 210009
摘要:
在实施可中断负荷项目时,因用户消费行为、客观条件等因素,造成了用户响应程度存在着不确定性,且其不确定性的大小与激励程度有直接联系,这种不确定性的大小最终影响整个系统的可靠性供电指标。构建考虑不确定性的可中断负荷响应模型,利用可中断负荷与备用的协调优化模型确定不同可靠性供电指标要求下的系统最优备用容量与不确定性可中断负荷配置关系。IEEE-RBT 6节点算例结果表明,大量用户响应具有明显的集群效应,有助于弥补单个用户响应的不确定性,并且在不同的可靠性要求下,优化模型中发电机备用与可中断负荷备用的配置具有不同的特点,体现了经济性和可靠性的协调,从而能够更合理地优化资源配置。
关键词:  需求响应  电力市场  不确定性  可中断负荷  备用  可靠性
DOI:
分类号:
基金项目:国家自然科学基金资助项目(71471036,51277028);国家电网公司科技项目(柔性负荷参与地区电网调度的关键技术研究与应用)
Optimal coordination between system reserve and interruptible loads with response uncertainty
WANG Beibei1, LI Yirong1, LI Yang1, DOU Xun2
1.Jiangsu Provincial Key Laboratory of Smart Grid Technology & Equipment,Southeast University,Nanjing 210096, China;2.School of Automation and Electrical Engineering,Nanjing University of Technology,Nanjing 210009,China
Abstract:
The response uncertainty of interruptible load is caused by different factors,such as user consumption behaviour,objective conditions,etc.,and its degree is directly related to the incentive extent,which will eventually affect the reliability index of overall system power - supply. An interruptible load model with response uncertainty is built and the optimization model of coordination between interruptible load and reserve is adopted to determine the configuration relationship between the optimal system reserve capacity and the interruptible load with response uncertainty under different reliability indexes. The results of case study for IEEE-RBT 6-bus system show that,the significant crowding effect of massive users may compensate the response uncertainty of single user;the different configuration characteristics of generator reserve and interruptible load in the optimization model under different reliability indexes make the resource configuration more reasonably optimized,reflecting the coordination in economy and reliability.
Key words:  demand response  electricity market  uncertainty  interruptible load  reserve  reliability

用微信扫一扫

用微信扫一扫