引用本文: | 张沈习,程浩忠,邢海军,姚良忠,张 逸.配电网中考虑不确定性的分布式电源规划研究综述[J].电力自动化设备,2016,36(8): |
| ZHANG Shenxi,CHENG Haozhong,XING Haijun,YAO Liangzhong,ZHANG Yi.Review of DG planning considering uncertainties for distribution network[J].Electric Power Automation Equipment,2016,36(8): |
|
摘要: |
间歇性分布式电源接入配电网运行大幅增加了配电网中的不确定性因素,给相关规划工作带来了新的挑战。介绍了适用于规划阶段的风电、光伏和负荷等一系列不确定性因素的建模工作;评述了传统配电网中考虑不确定性的分布式电源(DG)规划方法,包括多场景规划方法、机会约束规划方法和模糊规划方法;综述了主动配电网中考虑不确定性的规划方法,包括单层规划方法和双层规划方法。在此基础上,从网源协调规划、风险规划、考虑全寿命周期成本的DG规划、考虑需求侧管理的DG规划和考虑储能系统接入的DG规划等方面着手,展望了配电网中考虑不确定性的DG规划领域在未来可能出现的理论和方法。 |
关键词: 配电网 不确定性分析 分布式电源 选址定容 规划 |
DOI: |
分类号: |
基金项目:国家高技术研究发展计划(863计划)资助项目(2014 -AA051901);国家自然科学基金资助项目(51261130473) |
|
Review of DG planning considering uncertainties for distribution network |
ZHANG Shenxi1, CHENG Haozhong1, XING Haijun1, YAO Liangzhong2, ZHANG Yi3
|
1.Key Laboratory of Control of Power Transmission and Transformation,Ministry of Education,
Shanghai Jiao Tong University,Shanghai 200240,China;2.China Electric Power Research Institute,
Beijing 100085,China;3.Fujian Electric Power Research Institute,Fuzhou 350007,China
|
Abstract: |
The integration of intermittent DG(Distributed Generation) increases greatly the uncertain factors of distribution network,which brings new challenge to its planning. The modeling of the uncertain factors brought by wind turbine generators,photovoltaic generators,loads,and so on during the planning stage is introduced. The DG planning methods considering uncertainties for traditional distribution network are commented,including multi-scenario planning,chance-constrained planning and fuzzy planning. The active distribution network planning methods considering uncertainties are summarized,including single-level planning and bi-level planning. Furthermore,the theory and methodologies of DG planning considering uncertainties,which may arise for the future distribution network,are prospected in the aspects of coordinated grid-source planning,risk planning,DG planning considering life-cycle cost,DG planning considering demand-side management,DG planning considering energy storage system,etc. |
Key words: distribution network uncertainty analysis distributed power generation siting and sizing planning |