引用本文: | 胡应宏,余志森,邓春,王劲松,李雨.国家风光储示范电站黑启动中风机启动失败原因及对策分析[J].电力自动化设备,2017,37(2): |
| HU Yinghong,YU Zhisen,DENG Chun,WANG Jingsong,LI Yu.Cause of generator startup failure during black-start of national wind/photovoltaic/energy-storage pilot station and its countermeasure[J].Electric Power Automation Equipment,2017,37(2): |
|
本文已被:浏览 4283次 下载 1719次 |
|
|
国家风光储示范电站黑启动中风机启动失败原因及对策分析 |
胡应宏1,2, 余志森1,2, 邓春1,2, 王劲松1,2, 李雨1,2
|
1.华北电力科学研究院有限责任公司,北京 100045;2.国网冀北电力有限公司电力科学研究院,北京 100045
|
|
摘要: |
对风光储电站黑启动的试验过程中风机并网过程进行了分析。首先,重点分析了风机启动造成储能变流器跳闸的原因,并对风机参与黑启动的过程进行了仿真验证,指出由于风机缺少恰当的软启动过程,导致启动过电流,使得黑启动失败;然后,提出了风机参与黑启动过程中直流电压软启动的控制策略;最后,通过仿真对所提控制策略进行了验证,表明所提方法能够很好地避免风机变流器的启动过电流问题。 |
关键词: 黑启动 永磁直驱风机 风光储电站 储能变流器 风电 并网 软启动 |
DOI:10.16081/j.issn.1006-6047.2017.02.008 |
分类号:TM315;TM72 |
基金项目: |
|
Cause of generator startup failure during black-start of national wind/photovoltaic/energy-storage pilot station and its countermeasure |
HU Yinghong1,2, YU Zhisen1,2, DENG Chun1,2, WANG Jingsong1,2, LI Yu1,2
|
1.North China Electric Power Research Institute Co.,Ltd.,Beijing 100045, China;2.Electric Power Research Institute of State Grid Jibei Electric Power Company, Beijing 100045, China
|
Abstract: |
The grid-connection process of wind turbine during the black-start of a wind/photovoltaic/energy-storage station is analyzed. The cause of energy-storage converter trip due to the wind turbine startup is emphatically analyzed and the black-start process with wind turbine is simulated, which verifies that, the wind turbine startup overcurrent due to the lack of proper soft-startup process results in the black-start failure. The control strategy for the soft-startup of DC voltage is proposed for the black-start with wind turbine, which is verified by simulation, showing that the startup overcurrent of wind turbine converter is effectively avoided. |
Key words: black-start permanent magnet direct-drive generator wind/photovoltaic/energy-storage power station energy-storage converter wind power grid-connection soft-startup |