摘要:
从电网风险均衡角度出发,提出一种基于最小累积风险度的电网等风险检修决策模型。以电网检修引起的计划性失负荷量和故障引起的非计划性失负荷量的综合作为电网风险衡量标准,以电网风险在检修周期各时段接近相等为目标建立电网等风险检修模型;提出电网故障发生的概率及失负荷量的计算方法,并通过风险追踪方法确定电网当前运行方式下各待检修设备对电网风险的贡献程度,由大到小排序确定待检修设备决策序列;采用基于最小累积风险度的启发式方法求解模型,依次确定各设备的检修时段。算例表明,所提模型不仅实现了电网风险均衡的目标,并且能使检修周期内的电网总风险较小。
关键词:  电网检修  等风险  最小累积风险度法  风险追踪法
DOI:10.16081/j.issn.1006-6047.2017.11.024
分类号:TM732
基金项目:
Equal risk maintenance decision for power grid based on minimum cumulative risk
YUAN Ye1, WANG Huifang1, YING Gaoliang2, ZHANG Bo2, HE Benteng1
1.School of Electrical Engineering, Zhejiang University, Hangzhou 310027, China;2.State Grid Jinhua Power Supply Company, Jinhua 321017, China
Abstract:
An equal risk maintenance decision model based on minimum cumulative risk is proposed from the perspective of risk balancing of power grid. The scheduled load loss caused by power grid maintenance and unscheduled load loss caused by faults are comprehensively taken as the risk measure criterion of power grid, and an equal risk maintenance model is built with the objective of nearly equal risk during each period of power grid maintenance period. The calculation methods of fault probability of power grid and load loss are proposed, the contribution of each equipment to be examined to power grid risk under current operation mode is determined by the risk tracing method, and thus the decision sequence of equipments to be examined is determined by large to small order. The heuristic method based on minimum cumulative risk is adopted to solve the model for determining the maintenance interval of each equipment. Case shows that the proposed model can realize the objective of risk balancing and obtain small total risk during the maintenance period.
Key words:  maintenance for power grid  equal risk  minimum cumulative risk algorithm  risk tracing method