引用本文:王泽忠,司远,刘连光,张彩友,姚辉,陈水耀.基于视电阻率数据的电网地磁感应电流计算方法[J].电力自动化设备,2021,41(3):
WANG Zezhong,SI Yuan,LIU Lianguang,ZHANG Caiyou,YAO Hui,CHEN Shuiyao.Calculation method of power grid GIC based on apparent resistivity data[J].Electric Power Automation Equipment,2021,41(3):
【打印本页】   【HTML】   【下载PDF全文】   查看/发表评论  【EndNote】   【RefMan】   【BibTex】
←前一篇|后一篇→ 过刊浏览    高级检索
本文已被:浏览 3591次   下载 1525  
基于视电阻率数据的电网地磁感应电流计算方法
王泽忠1, 司远1, 刘连光2, 张彩友3, 姚辉3, 陈水耀3
1.华北电力大学 高电压与电磁兼容北京重点实验室,北京 102206;2.华北电力大学 新能源电力系统国家重点实验室,北京 102206;3.国网浙江省电力有限公司检修分公司,浙江 杭州 310000
摘要:
快速准确地计算地磁感应电流是利用电网调度预防地磁扰动(GMD)灾害的基础。基于大地电性结构模型利用有限元计算GMD地电场的方法,具有工作量大、耗时长的缺点,不能满足调度防灾的需求。提出对输电线路进行微元化处理,利用变异函数和滑动加权平均进行视电阻率估计,结合地磁台地磁场实测数据直接计算微元GMD地电场。仿真实验结果表明,与建立大范围大地电导率模型并采用有限元计算的方法相比,利用视电阻率计算GMD地电场的方法省略了复杂的大地建模过程,提高了计算精度,缩短了运算时间,可为电网调度防治GMD灾害提供基础算法。
关键词:  视电阻率  GMD  地电场  变异函数  地磁感应电流
DOI:10.16081/j.epae.202101019
分类号:TM732
基金项目:国家重点研发计划项目(2016YFC0800100)
Calculation method of power grid GIC based on apparent resistivity data
WANG Zezhong1, SI Yuan1, LIU Lianguang2, ZHANG Caiyou3, YAO Hui3, CHEN Shuiyao3
1.Beijing Key Laboratory of High Voltage and EMC, North China Electric Power University, Beijing 102206, China;2.State Key Laboratory of Alternate Electrical Power System with Renewable Energy Sources, North China Electric Power University, Beijing 102206, China;3.Maintenance Branch of State Grid Zhejiang Electric Power Co.,Ltd.,Hangzhou 310000, China
Abstract:
Rapid and accurate calculation of GIC(Geomagnectically Induced Current) is the basis of using power grid scheduling to prevent GMD(GeoMagnetic Disturbance) disaster. The geoelectric structure model-based GMD geoelectric field calculation method using finite element has the disadvantages of extensive workload and time-consuming, which cannot meet the requirements of disaster prevention. The transmission line is treated with micro elements, the apparent resistivity is estimated by using variation function and sliding weighted average method, and the GMD geoelectric field of micro element is calculated directly by combining the measured data of geomagnetic field at geomagnetic platform. Simulative results show that, compared with the method based on the establishment of large-range earth electrical conductivity model and finite element calculation, the proposed method can omit the complex modeling process of earth, improve the calculation accuracy, shorten the calculation time, and provide a basic algorithm for power grid dispatching to prevent GMD disasters.
Key words:  apparent resistivity  GMD  geoelectric field  variation function  geomagnetically induced current

用微信扫一扫

用微信扫一扫