| 引用本文: | 汪顺其,丁涛,丁玉杰,杨岳洋,赵焕蓓,赵东宁.考虑快速可拆卸变压器的变电站-配电网协同故障恢复方法[J].电力自动化设备,2025,45(10):100-109. |
| WANG Shunqi,DING Tao,DING Yujie,YANG Yueyang,ZHAO Huanbei,ZHAO Dongning.Substation-distribution network cooperative fault recovery method considering quickly-detachable transformer[J].Electric Power Automation Equipment,2025,45(10):100-109. |
|
| 摘要: |
| 变电站故障会导致供电区内的配电网瘫痪,造成大面积失电。为此,提出一种考虑快速可拆卸变压器的变电站-配电网协同故障恢复方法。构建快速可拆卸变压器应用下的故障恢复框架,阐明变电站变压器的恢复机理;提出“运输 — 维修”二阶段恢复策略,涵盖快速可拆卸变压器、线路、小型配电变压器3类故障;计及网络重构,建立变电站-配电网故障恢复优化模型,利用广义Benders分解算法进行求解。基于改进的141节点配电网算例进行仿真,验证所提方法的有效性。仿真结果表明,所提方法能够有效缩短变电站-配电网系统故障恢复时间,提高负荷恢复率,且具有更高的求解效率。 |
| 关键词: 配电网 故障恢复 快速可拆卸变压器 线路维修 变电站 |
| DOI:10.16081/j.epae.202508016 |
| 分类号: |
| 基金项目:智能电网重大专项(2030)(2024ZD0802000);国家电网公司科技项目(52280024000L) |
|
| Substation-distribution network cooperative fault recovery method considering quickly-detachable transformer |
|
WANG Shunqi1, DING Tao1, DING Yujie2, YANG Yueyang1, ZHAO Huanbei2, ZHAO Dongning2
|
|
1.School of Electrical Engineering, Xi’an Jiaotong University, Xi’an 710049, China;2.State Grid Qinghai Electric Power Research Institute, Xining 810000, China
|
| Abstract: |
| The substation fault will lead to the paralysis of distribution network within the supply area, resulting in widespread power outage. Therefore, a substation-distribution network cooperative fault recovery method considering quickly-detachable transformer is proposed. A fault recovery framework under the application of quickly-detachable transformer is constructed, the recovery mechanism of transformer in the substation is elucidated. A “transport-repair” two-stage recovery strategy is proposed, which covers three types of faults of quickly-detachable transformer faults, line faults, and small distribution transformer faults. Conside-ring the network reconfiguration, an optimization model for substation-distribution network fault recovery is established, and the generalized Benders decomposition algorithm is used for solution. The simulation is carried out based on a modified 141-node distribution network example to validate the effectiveness of the proposed method. The simulative results show that the proposed method can effectively shorten the fault recovery time of substation-distribution network system, improve the load recovery rate, and has higher solving efficiency. |
| Key words: distribution network fault recovery quickly-detachable transformer line repair substation |