引用本文:丁然,李寅晓,姚一鸣,邱威,郭鸿业.考虑输电线路动态增容技术的鲁棒机组组合[J].电力自动化设备,2026,46(1):217-224
DING Ran,LI Yinxiao,YAO Yiming,QIU Wei,GUO Hongye.Robust unit commitment considering dynamic capacity expansion technology of transmission lines[J].Electric Power Automation Equipment,2026,46(1):217-224
【打印本页】   【HTML】   【下载PDF全文】   查看/发表评论  【EndNote】   【RefMan】   【BibTex】
←前一篇|后一篇→ 过刊浏览    高级检索
本文已被:浏览 1597次   下载 44 本文二维码信息
码上扫一扫!
考虑输电线路动态增容技术的鲁棒机组组合
丁然1,2, 李寅晓2, 姚一鸣1, 邱威1, 郭鸿业2
1.国网冀北电力有限公司,北京 100052;2.清华大学 电机系 新型电力系统运行与控制全国重点实验室,北京 100084
摘要:
高比例可再生能源的接入将使电力系统调度面临日益严重的电网阻塞难题。为了充分挖掘输电线路的潜在传输容量,提出一种考虑动态增容技术的鲁棒机组组合方法。提出基于盒式集合与椭球集合相结合的不确定集合构建方法,以准确刻画风电出力与线路动态传输容量的不确定性与时空相关性。建立考虑动态增容的两阶段鲁棒机组组合模型,并采用列与约束生成算法与基于卡罗需-库恩-塔克(KKT)条件的模型转化方法进行求解。通过算例分析验证所提方法的有效性,结果表明:动态增容技术能够显著增加输电线路的传输容量,提升系统运行的经济性;不确定集合构建方法可以更准确地刻画不确定性因素的取值范围与相关性,改善决策结果的保守性。
关键词:  动态增容  鲁棒机组组合  两阶段鲁棒优化  不确定集合  可再生能源
DOI:10.16081/j.epae.202508005
分类号:TM73
基金项目:国家自然科学基金资助项目(52130702)
Robust unit commitment considering dynamic capacity expansion technology of transmission lines
DING Ran1,2, LI Yinxiao2, YAO Yiming1, QIU Wei1, GUO Hongye2
1.State Grid Jibei Electric Power Co.,Ltd.,Beijing 100052, China;2.State Key Laboratory of Power System Operation and Control, Department of Electrical Engineering, Tsinghua University, Beijing 100084, China
Abstract:
The access of high proportion of renewable energy will make power system scheduling face increasing grid congestion problem. In order to fully exploit the potential transmission capacity of transmission lines, a robust unit commitment method considering dynamic capacity expansion technology is proposed. An uncertainty set construction method based on the combination of box set and ellipsoid set is proposed to accurately portray the uncertainty and spatiotemporal correlation of wind power output and line dynamic transmission capacity. A two-stage robust unit commitment model considering dynamic capacity expansion is built, and it is solved by the column and constraint generation algorithm and a model transformation method based on KKT condition. The effectiveness of the proposed method is verified by the example analysis, and the results show that the dynamic capacity expansion technology can significantly increase the transmission capacity of transmission lines and improve the economy of system operation, and the uncertainty set construction method can more accurately portray the range and correlation of uncertainty factors and improve the conservatism of the decision-making results.
Key words:  dynamic capacity expansion  robust unit commitment  two-stage robust optimization  uncertainty set  renewable energy