引用本文:王守相,周凯,苏运.基于随机森林算法的台区合理线损率估计方法[J].电力自动化设备,2017,37(11):
WANG Shouxiang,ZHOU Kai,SU Yun.Line loss rate estimation method of transformer district based on random forest algorithm[J].Electric Power Automation Equipment,2017,37(11):
【打印本页】   【HTML】   【下载PDF全文】   查看/发表评论  【EndNote】   【RefMan】   【BibTex】
←前一篇|后一篇→ 过刊浏览    高级检索
本文已被:浏览 4387次   下载 1712  
基于随机森林算法的台区合理线损率估计方法
王守相1, 周凯1, 苏运2
1.天津大学 智能电网教育部重点实验室,天津 300072;2.国网上海市电力公司,上海 200122
摘要:
线损管理是电力公司的重点管理内容之一,低压电网普遍采用分台区的管理手段。供电侧数据缺失和营销抄表日期冲突导致的线损率缺失是电力公司线损系统中台区线损数据存在的主要问题。为此,提出了一种涉及多源数据的基于随机森林算法的台区合理线损率估计方法。从线损系统、生产管理系统和营销系统中提取台区、变压器和用户相关数据,建立台区特征数据库;对台区进行聚类分析,并在此基础上建立决策树分类模型和随机森林估计模型;利用上述模型估计台区线损率。以上海电力公司实际数据为例,计算结果验证了所提方法的可行性;并将所得结果与线性回归模型和回归树模型的估计结果进行比较,表明所提方法性能优越。
关键词:  台区线损率  线损管理  多源异构数据  层次聚类  决策树  随机森林算法
DOI:10.16081/j.issn.1006-6047.2017.11.007
分类号:TM721
基金项目:国家高技术研究发展计划(863计划)资助项目(2015-AA050203)
Line loss rate estimation method of transformer district based on random forest algorithm
WANG Shouxiang1, ZHOU Kai1, SU Yun2
1.Key Laboratory of Smart Grid of Ministry of Education, Tianjin University, Tianjin 300072, China;2.State Grid Shanghai Electric Power Company, Shanghai 200122, China
Abstract:
Line loss management is one of the key management contents of electric power company and district-dividing is a common management means in low-voltage power grid. The missing of line loss rate data caused by the data missing at power supply side and the mismatching of record time is the key problem in the line loss system of electric power company. Aiming at the above problems, a line loss rate estimation method of transformer district based on random forest algorithm is proposed involving multi-source data. Related data of transformer districts, transformers and loads are extracted from line loss system, production management system and marketing system to establish the feature database of transformer district. Then, the transformer districts are clustered, based on which the decision tree classification model and random forest estimation model are established. Finally, the line loss rate of the transformer district is estimated by the above models. Calculative results of Shanghai Electric Power Company verify that the proposed method is feasible and has superior performance compared with the estimation results of linear regression model and regression tree model.
Key words:  transformer district line loss rate  line loss management  multi-source heterogeneous data  hierarchical clustering  decision-making tree  random forest algorithm

用微信扫一扫

用微信扫一扫