摘要:
为了降低风光电站并网给电力系统电压稳定性带来的负面影响,提出了计及静态电压稳定性的风光电站选址定容协同规划方法。分析了风光电站的发电特性,并对其建立数学模型;考虑并网等值阻抗和静态电压稳定性的内在制约关系,进一步综合风光电站及其汇集站选址定容、并网点位置等优化目标,建立了风光电站选址定容协同规划模型;基于地图栅格化和分段线性化方法,将所提规划模型转换为混合整数线性规划模型;在此基础上,利用K-means算法提取典型场景,并给出了所提模型的求解流程。基于西南某地区的实际数据进行算例验证,结果表明所提规划方法能够充分发挥规划区域内自然资源的禀赋特性和风光发电互补性,有效提高了风光电站并网后的静态电压稳定性。
关键词:  风光电站  静态电压稳定性  选址定容  协同规划  混合整数线性规划
DOI:10.16081/j.epae.202302025
分类号:TM715;TM614;TM615
基金项目:国家电网有限公司科技项目(52999820000X)
Coordinated siting and sizing planning method of wind and photovoltaic power stations considering static voltage stability
LU Liang1, WEI Mingkui1, ZHANG Huaiyuan2, JIANG Li1, SHEN Li1, LIAO Kai2
1.Southwest Branch of State Grid Corporation of China, Chengdu 610095, China;2.School of Electrical Engineering, Southwest Jiaotong University, Chengdu 611756, China
Abstract:
In order to reduce the negative impact of grid-connection of wind and photovoltaic power stations(WPPSs) on the voltage stability of power system, a coordinated siting and sizing planning method of WPPSs considering static voltage stability is proposed. The power generation characteristics of WPPSs are analyzed and their mathematical models are established. Considering the internal restriction relationship between equivalent grid-connected impedance and static voltage stability, the coordinated siting and sizing planning model of WPPSs is established by synthesizing optimization objectives such as siting and sizing of WPPSs and their collection stations, grid-connected point, and so on. Based on the map rasterization and piecewise linearization mthods, the proposed planning model is transformed into a mixed integer linear programming model. On this basis, K-means algorithm is used to extract typical scenes and the solution process of the proposed model is given. Based on the actual data of a region in Southwest China, the simulative results show that the proposed planning method can give full play to the natural resource endowment characteristics in the planning region and the complementarity of wind and photovoltaic power, and effectively improve the static voltage stability of the system with grid-connected WPPSs.
Key words:  wind and photovoltaic power stations  static voltage stability  siting and sizing  coordinated planning  mixed integer linear programming